PREPARATIONS
FOR
INITIAL
START-UP
PRESTARTINSPECTION
This section
of
the manual provides the operator with prepa-
ration, initial starting, break-in, starting (warm
or
cold) and
stopping procedures. Follow the procedures as presented for
the conditions indicated and your WESTERBEKE generator
set will give reliable performance and long service life.
Before starting your generator set for the first time or after a
prolonged layoff, check the following items:
D Check the engine oil level. Add oil to maintain the level at
the high mark
on
the dipstick.
D Check the fuel supply and examine the fuel filter/separator
bowls for contaminants.
D Check the
DC
electrical system. Inspect wire connections
and battery cable connections.
D Check the coolant level in both the plastic recovery tank
and at the manifold.
D Visually examine the unit. Look for loose
or
missing
parts, disconnected wires, unattached hoses, and check
threaded connections.
D Check load leads for correct connection as specified in the
wiring diagrams.
D Examine air inlet and outlet for air flow obstructions.
D
Be
sure no other generator or utility power is connected to
load lines.
D
Be
sure that in power systems with a neutral line that
the neutral is properly grounded (or ungrounded) as the
system requires, and that the generator neutral is properly
connected to the load neutral. In single phase and some
3-phase systems an incomplete or open neutral can supply.
the wrong line-to-neutral voltage
on
unbalanced loads.
D Make sure the mounting installation is secure.
D Make sure that the generator is properly grounded.
A
CAUTION:
When
starting
the
generator,
it
is
recommended
that
al/
AC
loads,
especially
large
motors,
be
switched
OFF
until
the
engine
has
come
up
to
speed
and,
in
cold
Climates,
starts
to
warm
up.
This
precaution
will
prevent
damage
caused
by
unanticipated
operation
of
the
AC
machinery
and
will
prevent
a
cold
engine
from
stalling.
GENERATOR
VOLTAGE
The speed
of
the genera.tor engine is adjusted at the factory,
however, it is advisable to verify.
To supply 60 Hertz, the speed should be
1800 RPM at no load,
and should not fall below
1800
RPM
by more than 5 percent
(3 Hz) at full load.
Generator voltage should build to its rated value within
5 seconds after rated speed is attained. Record or observe volt-
age
of
generator at no load and at full load (hot). The voltages
are easily adjusted to optimum values no load and full load
(refer to
VOLTAGE
ADJUSTMENT in this manual).
If
possible,
apply actual service load
or
test load
of
the same power factor
as the load to be used
in
service.
If
voltage cannot be adjusted
to suitable values and some fault seems evident, contact your
authorized WESTERBEKE service dealer.
OIL
FILL
CAP
OIL
DIPSTICK
/MAX
LOW
TO
NIPPLE
AT
COOLANT
RECOVERY
TANK
MANIFOLD
PRESSURE
CAP
Engines & Generators
6