Westerbeke 20.0KW sbeg Spezifikationen Seite 17

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 61
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 16
PREPARATIONS
FOR
INITIAL
START-UP
~P:LA~cS;DTliiECliCyOOLANT
HI
TANK
THIS
LINE
RETURNS
COOLANT
TO
THE
ENGINE
PRESTARTINSPECTION
EXHAUST
MANIFOLO
Before starting your generator
for
the
first
time
or after a
prolonged
layoff,
check
the
following
items:
Check
the
engine oil
level:
add
oil
to
maintain
the
level
at
the
full
mark
on
the
dipstick.
Check
the
fuel
supply
and
examine
the
fuel
filter/separator
bowls for contaminants.
Check
the
DC
electrical
system.
Inspect
wire
connections
and
battery cable connections.
NOTE:
The starting battery
must
be
totally dedicated to the
generator
and maintained
by
the
generator~
DC
charging
altemalor
and
no
other source.
Check
the
coolant
level
in
both
the
plastic recovery tank
and
at
the
manifold.
NOTE:
After
the initial running
of
the generator, the air in .
the engine
~
cooling system will be purged to the coolant
recovery tank. Open the
air
bleed petcock to ensure that
the cooling system
is
purged
of
air.
After
shutdown
and
after the engine has cooled, the coolant from the recovery
tank will
be
drawn into the engine
~
cooling system to
replace the purged
air.
Before subsequent operation
of
the generator, the engine
~
manifold should
be
topped
off
and
the coolant recovery
tank's level brought to
114
full.
MANIFOLO
PRESSURE
CAP
I
BLEED
OIL
DIPSTICK
Visually
examine
unit.
Look
for
loose
or
ntissing
parts,
disconnected
wires,
unattached
hoses,
and
check
threaded connections.
Search
for
any
gasoline
leaks.
Check
load
leads
for
correct connections
as
specified
in
the
wiring
diagrams.
Examine
the
air
inlet
and
outlet
for
air
flow
obstructions.
Be
sure
no
other generator
or
utility
power
is
connected
to
the
load
lines.
Be
sure
that
in
power systems
with
a
neutral
line
that
the
neutral
is
properly
grounded (or
ungrounded)
as
the
system
requires,
and
that
generator
neutral
is
properly
connected
'to
the-load
neutral.
In
single
phase
systems
an
incomplete
or
open
neutral
can
supply
the
wrong
line-to-neutral
voltage
on
unbalanced
loads.
..
Make
certain
the
raw
water thru-hull
is
open.
A
CAUTION:
When
starting
the
generator,
it
is
recommended
that
all
AC
loads,
especially
large
motors,
be
switched
OFF
until
the
engine
has
come
up
to
speed
and,
in
cold
climates,
starts
to
WBmI
up.
This
precaution
will
prevent
damage
caused
by
unanticipated
operation
of
the
AC
machinery
and
will
prevent
a
cold
engine
from
stalling.
Engines & Generators
6
Seitenansicht 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 60 61

Kommentare zu diesen Handbüchern

Keine Kommentare